01 · Kitchens
What a Stonebridge kitchen includes.
Every kitchen starts with a measured drawing and a layout review — because moving a wall six inches on paper costs nothing, and moving it later costs everything.
- Layout reconfiguration, walls, islands and peninsulas
- Custom and semi-custom cabinetry with soft-close hardware
- Stone counters, full-height backsplashes and under-cabinet lighting
- Flooring, plumbing, electrical and appliance installation
Before / After
Same footprint, different kitchen.
Most of our kitchens keep the existing footprint — the transformation is in layout, light and storage.

Capabilities
Three ways we remodel.
Pull-and-Replace
Same layout, all-new everything: cabinets, counters, appliances, lighting and floors. The fastest path to a new kitchen — typically 3–5 weeks.
Layout Rework
Move walls, add an island, open to the living room. We handle engineering, permits and structural work in-house. Typically 6–10 weeks.
Luxury Build-Out
Custom cabinetry, professional ranges, butler's pantries and layered lighting design. A flagship kitchen, managed down to the last outlet cover.
Kitchen FAQs
Good questions.
How long does a kitchen remodel take?
A pull-and-replace runs 3–5 weeks; a layout rework with structural changes runs 6–10 weeks. Your estimate lists the week-by-week schedule before we start, and your project manager confirms it in every weekly update.
Can we live in the house during the remodel?
Yes — most clients do. We seal the work zone with dust barriers, set up a temporary kitchenette station, and schedule loud work for mid-day hours.
Do you handle permits and inspections?
Completely. Electrical, plumbing, structural — we file, schedule and attend every inspection so you never stand in line at the permit office.
Free estimates
Start with a free kitchen visit.
60–90 minutes, your kitchen, zero pressure. We'll measure, listen and tell you what's possible at your budget.